SAP and Earned Value Management
ERP and General Ledger systems like SAP play an important role in Earned Value Management Systems. Pinnacle has implemented Earned Value Management Systems that are integrated with SAP to provide essential information for Earned Value Management System cost and performance analysis.
In an EVMS implementation, SAP will provide critical information such as:
- Time reporting information
- Purchasing information, including actual costs
- Supplier actual and estimated actual costs
- Subcontract invoices and costs
- Other Direct Costs
- Travel Costs
- Overhead Costs
- General Administrative Costs
This information is extracted from SAP and then input into EVM tools such as Primavera Cost Manager, EcoSys EPC, Deltek Cobra, Deltek MPM, etc.
Pinnacle has used a number of different methods to extract the data listed above. In addition to determining how to integrate SAP with other Earned Value Management tools, there is almost always a need to adjust processes and the level of detail to correctly capture information. The most common area that needs to be refined in SAP is the timesheet information.
Talk to a Pinnacle professional about how to integrate your SAP system with an Earned Value Management System - Give Us a Call or 
Topics: Aerospace & Defense, Energy, Utilities, Oil & Gas, Earned Value Management (EVM), Integrated Program Management (IPM), Technology
By Pinnacle Management Systems, Inc.
Founded in 1993, Pinnacle provides a wide range of professional services through 4 primary service lines: Management Consulting, Technology Systems Implementation, Training & Education, Functional Fulfillment. Pinnacle has extensive experience implementing and optimizing enterprise-wide capabilities in all Project Management related practices.
