ERP and General Ledger systems like SAP play an important role in EVM Systems. Pinnacle has implemented EVM Systems that are integrated with SAP to provide essential information for EVMS cost and performance analysis.
In an EVMS implementation, SAP will provide critical information such as:
This information is extracted from SAP and then input into EVM tools such as Primavera Cost Manager, EcoSys EPC, Deltek Cobra, Deltek MPM, etc.
Pinnacle has used a number of different methods to extract the data listed above. In addition to determining how to integrate SAP with other EVM tools, there is almost always a need to adjust processes and the level of detail to correctly capture information. The most common area that needs to be refined in SAP is the timesheet information.
Talk to a Pinnacle professional about how to integrate your SAP system with an EVM System - Give Us a Call or